Working Steps

After being placed at the crane rail the grinding centre works program controlled. The ridges on both sides of the rail will be removed by our machine.

Rails that are rinded out horizontally will be welded professionally and the original profile of the rail will be restored by our grind machine.

All vertical and horizontal rail profiles (also curves) can be processed.

Normally the production in the hall can be continued during the crane rail repair due to our advanced technology and the flexible working hours (also at weekend, on holidays, over-night etc.). No cost intensive production break down, especially if the repair can be carried out before the crane must be stopped due to destructed rails.

rails de voie de roulement de grues usés et ondulés dans un virage

 

rails grinded out in a curve