Change of crane rail

If welded crane rails should be irreparable, we change these crane rails by using our time and cost saving method. Until now normally the total rail hat to be changed or the used up rails had to be cut-off with most difficult specifications by hand.

 

NEW and unique: We cut-off the weld seam of the used up rails by our stationary cutt-off grinding method (both sides simultaneously). Track laying of new crane rails, measuring and welding are following worksteps, we do professional and shortly, also off-time.

Your Advantages at a glance:

  • significant shorter lead-time
  • saving expenses for complete rail as well es its conditioning and priming
  • working process on sections possible during changing of the crane rails